 |

 |
 |
XL Vision,
Incorporated
Location: Sebastian, Florida
Project Type: New Construction
Services Provided: Master Plan, Architectural, Civil,
Structural, Mechanical, Electrical, Plumbing, Construction Documents,
Construction Administration
Budget: $4,000,000
Project Duration: 12 Months
Compeletion Date: 1997 |
| |
 |
| |
| |
.......................................................................................................
Project Description:
This Building is the Research and Development
Component for XLVision, Inc. It is the second building developed
in their Research Park located in Sebastian, Florida. Both buildings
are separated by a man-made lake and connected with a bridge structure.XL
Vision, Inc. serves as an incubator for developing products dealing
with high tech imaging.
The building is Industrial in nature and
this is reflected in the choice of building materials; steel rigid
frame, metal panels, architectural block, glass and steel storefront.
The building consists of the 2 Story Research & Development
Facility connected to the Employees Gymnasium and Leisure Area
which in turn is connected to the Administration Wing via a 2
Story "Spine" which brings lateral daylight into the
corridor below. The termination of the "Spine" is an
imposing glass and steel pointed structure which announces the
Building Entrance.
Part of the Design Brief from XL Vision, Inc. was to create a
corporate image which reflects the High Tech Nature of their Business
and the imposing presence of this structure does just that.
|
|